Process Control can supply systems for multi-phase testing of well streams. Our design includes a 7lt separation cylinder in 6Mo with sight glass (PED certified to 257barG), which will give the operator control of phase levels during filling. Heavy components like water and condensate are extracted from the low end of the separator, while gas samples are extracted from the high end.
All materials are according to Norsok.